Call 1-800-INSTALLOften same-day appointmentsFree quotesHome and officeinfo@1800install.com

Control4 pre-wire

Pre-wiring a new home for Control4

The best Control4 homes are planned before drywall. Here's what to run, where the equipment goes and what your builder and electrician need to know.

Authorized Dealer

Wiring is the part of a smart home you can't easily add later. Running the right cables during framing costs a fraction of what it costs after walls are closed, and it makes the finished system faster, more reliable and easier to grow.

We pre-wire homes for Control4 across New Jersey and New York and coordinate directly with builders, electricians and HVAC contractors. Even if you're not ready to buy the full system, a proper pre-wire keeps every option open. Builders: see working with us.

Plan once, wire onceEvery room ready for later.
We work with your builderSchedules, walkthroughs, trades.
Labeled and documentedEvery cable mapped to a room.
Ready for Control4Or any system you choose later.

What to run

The Control4 pre-wire checklist.

  • Equipment location: a central rack or closet with ventilation, a dedicated circuit and conduit to the main TV areas
  • Network: Cat6 to every TV, office, and ceiling Wi-Fi access point location
  • TVs: Cat6 and HDMI conduit at each TV, plus in-wall power behind wall-mounted TVs
  • Audio: speaker wire from each speaker location back to the rack, and to volume keypads
  • Lighting: deeper boxes and neutral wires at keypad and dimmer locations; agree keypad spots with the electrician
  • Shades: power or low-voltage wire at each motorized shade, and shade pockets where planned
  • Security: Cat6 to each camera, door station and gate, plus alarm panel and sensor wiring
  • Climate: thermostat wiring with a common wire, coordinated with HVAC
  • Touch screens: Cat6 at kitchen, entry and primary bedroom screen locations
  • Outdoors: speaker wire and Cat6 to patios, pools and outdoor TVs, with conduit where needed

Working together

How we fit into a build.

We walk the framed house with you or your builder, mark every location, run and label the cables, and leave a map of what went where. We come back for trim and final to install devices and program the system. Because we coordinate with the other trades, low voltage doesn't hold up drywall, and nothing gets buried that shouldn't be.

FAQ

Pre-wiring a new home for Control4: common questions

When should Control4 pre-wire happen?

After framing and rough electrical, before insulation and drywall. We schedule it with your builder so it doesn't slow the job.

Can I pre-wire now and buy the system later?

Yes. A good pre-wire keeps every option open, so you can add Control4 room by room after you move in.

Do you work with our builder and electrician?

Yes. We coordinate locations, box sizes, power and schedules with the other trades. Builders can partner with us on every home.

Do you pre-wire outside New Jersey?

We pre-wire across New Jersey, New York City, Long Island, Westchester and Rockland, and take on Control4 projects further away.

Free quote. Often same-day appointments.

Plan your Control4 pre-wire.

Get a Free Quote Call 1-800-467-8255
Call 1-800-INSTALLFree quote
1-800-INSTALL

Get a free quote

Tell us about your project, or call 1-800-INSTALL. We'll get back to you with a quote.